LIVE RATES
Grade-60 Steel (Mughal / Amreli): PKR 270.28 / Kg Verified
OPC Cement (Bestway / Fauji / Maple Leaf): PKR 1,641 / 50kg Bag Competitive
Awwal Red Clay Bricks: PKR 21,390 / 1,000 Bricks Verified
Chenab River Coarse Sand: PKR 90 / Cu. Ft. Active
Margalla Clean Bluestone Crush (Bajri): PKR 188 / Cu. Ft. Verified
Civil Grey Structure: PKR 2,650 / sq. ft. Verified
A+ Luxury Turnkey Finishing: PKR 4,600 / sq. ft. Verified
PEC C-3 #24810
Staff Portal
Civil Engineering AI Utilities

Construction Tools & Calculators

Instant civil formulas calibrated for Pakistan standards (Marla, 1:2:4 Concrete, Bricks, Steel, Tiles, Plaster, Paint, Earthwork & Water Tanks).

House Construction Cost Estimator (PKR)

Civil budget estimates calibrated with current 2026 Pakistan material rates.

2026 Material Index
Custom Area Active
sqft
Quick adjust:
Material Inflation Sensitivity ("What-If" Analysis)
Steel Rebar Price Shift:
-30 PKR Market Base +30 PKR
Cement Bag Price Shift:
-150 PKR Market Base +150 PKR
Architectural Plan & Floor Schedule:
Ground Floor:
1st Floor:
2nd Floor:
Mumty / Stair:
Basement:
Estimated Accommodations Schedule:

PKR
/sqft
Apply Custom Rate to BOQ Scope:
Quick adjust step:
Civil Budget Summary
Custom Area Custom Rate
Labour-Only Contract Scope Materials by Client

All building materials (bricks, cement, steel, sand, crush, conduits, pipes & fixtures) to be provided by the client. Contractor supplies master mistri, mazdoor, concrete mixers, and needle vibrators.

1. Civil Structure, Masonry & Concrete:
2. Steel Rebar Bending & Shuttering:
3. Internal & External Plastering:
4. Electrical Conduit Wall Chasing (Jhirri):
5. Sanitary Drainage & Plumbing Labour:
Total Labour Execution Amount
AI Civil Duration Schedule: AI Auto-Calibrated
Phase 1
Phase 2 RCC Slabs
Phase 3 Plaster/MEP
Phase 4 Handover

Grey Scope: Excavation, Masonry, Plaster, Chowkats, Grills, Main Gate & Piping No Finishing
Finishing Scope: Floor/Bath Tiles, Ash/Flush Doors, Aluminum Windows, Wiring & Luxury Baths Civil Excluded
AI Civil Duration Schedule: AI Auto-Calibrated
Phase 1
Phase 2 RCC Slabs
Phase 3 Plaster/MEP
Phase 4
Open Direct Chat with Engineer (wa.me)

Receive Estimate on WhatsApp

Instant PDF & BOQ breakdown via LeadBot CRM

Plot & Area:
Total Budget:
Bricks & Cement:

We will send you the complete BOQ estimate and material requirements.

Plot Area & Land Converter

Bi-directional real-time conversion between Marla, Kanal, Sq. Ft., Ghaz (Sq. Yards) and Meters.

Punjab & CDA Standards
Equivalent Land Units:
Total Marla:
Total Kanal:
Square Yards (Ghaz):
Square Meters:
Acres:

Concrete Mix & Batch Material Calculator

Dry volume (+54% factor) with cement bags, sand, Margalla crush, and mixing water.

1:2:4 / M15 Nominal
Batch Material Output:
Wet / Dry Volume:
Cement Bags (50kg):
Chenab Sand:
Margalla Blue Crush:
Estimated Material Cost:

Red Clay Brick & Mortar Estimator

Pakistani standard Awwal red bricks with doors/windows opening deductions.

Awwal Grade
Masonry Material Output:
Awwal Red Bricks:
Net Masonry Area / Volume:
Cement Bags for Mortar:
Chenab Sand:
Total Material Cost:

Steel Rebar (Grade-60) Weight Estimator

Tonnage, weight, and price for ASTM A615 Grade-60 deformed steel rebar.

ASTM Grade-60
Rebar Weight & Cost:
Total Steel Mass:
Metric Tons:
Total Length:
Total Estimated Cost:

Floor & Wall Tile Estimator

Tile cartons, pieces, adhesive bond bags, and grout with cutting wastage.

Porcelain & Ceramic
Flooring Output:
Total Tile Cartons:
Individual Tiles:
Tile Bond Adhesive (20kg):
Grout Filler:
Total Material Cost:

Cement Plaster Estimator (Internal & External)

Calculates cement bags, Chenab sand, brick joints filling, and water for wall & ceiling plaster.

Plaster Mortar
Plaster Batch Materials:
Cement Bags (50kg): Mortar Ratio 1:
Chenab River Sand:
Applied Thickness:
Water for Mixing:
Recommended Curing: 7 – 10 Days Constant
Estimated Material Cost:

Wall Paint, Primer & Coating Estimator

Plastic emulsion, weather shield, water sealer primer, putty filling & paint buckets.

Architectural Paints
Paint Material Requirements:
Topcoat Paint:
Water Sealer Primer:
Wall Putty / Filling:
Paint System:
Total Material Cost:

Earthwork & Excavation Estimator

Foundation trench, basement excavation, and dumper soil cartage truckloads.

Civil Earthwork
Excavation & Disposal Output:
Dumper Cartage Trucks:
Total In-Situ Volume:
Volume in Cubic Meters:
Loose Soil Volume (+25% Swell):
Excavation & Cartage Cost:

Water Tank Capacity & Volume Estimator

Underground (UGWT) & overhead (OHWT) reinforced concrete tank storage in Gallons and Liters.

RCC Water Storage
Average Pakistan residential family consumes 200–300 gallons/day.
Storage Capacity Output:
Total Water Capacity:
Total Tank Internal Volume:
Water Reserve Duration:
RCC Retaining Concrete Volume:
Estimated Cement (1:2:4 Waterproof):
Added to Cart!

Item added successfully

View Cart